Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 5 results ...

Aouad, G F, Kawooya, A A O and Price, A D F (1996) Construction planning models: a review of history, capabilities and limitations. Journal of Construction Procurement, 2(02), 19–37.

Gidado, K and Barter, G (1996) The constraints to effective information flow in the construction management procurement system. Journal of Construction Procurement, 2(02), 52–68.

  • Type: Journal Article
  • Keywords: construction manager; designer; information flow; procurement
  • ISBN/ISSN: 1358-9180
  • URL: http://www.journalofconstructionprocurement.com/abstractdetails.asp?id=19
  • Abstract:
    The construction industry seems to suffer from a general inability to manage design information. The problem is that of a lack of understanding and good communication between design and construction teams. Information is often not delivered from the design team at the right time or in the right form to the contractor to allow construction of the project to time, cost and quality objectives. The process of information flow between designers and construction managers is described in a construction management procurement setting. The constraints affecting the process are identified with regard to achieving project savings in cost and time and quality control. A conceptual model has been developed with a view to aiding effective management of information flow between the designers and construction managers. The concept proposes a model by which information can be effectively managed through the integration of design, selection and construction phases of a project. Literature search, practical experience, and structured interviews with experts in the industry form the basis of the work described in the paper.

Kumaraswamy, M M and Dissanayaka, S M (1996) Procurement by objectives. Journal of Construction Procurement, 2(02), 38–51.

Songer, A D, Molenaar, K R and Robinson, G D (1996) Selection factors and success criteria for design-build in the USA and UK. Journal of Construction Procurement, 2(02), 69–82.

Walker, D H T (1996) The contribution of the construction management team to good construction time performance: an Australian experience. Journal of Construction Procurement, 2(02), 4–18.